Copyright © Moores Go
Design by Dzignine
Tuesday, June 30, 2015

Turning the Corner on the Bath Redo

Finishes have started going in for the bathroom!

The heated floor in all it's orange glory.
 Floor and wall tile.
 Shower area. We decided to add more wall tile so the entire wall on the left will be tiled.
 Vanity and tub.
Our pal Rob hung the vanity and did trim carpentry this weekend.
The painters and plumber will be here this week. Painters will tackle the bathroom and master bedroom plus part of FFM's room where some drywall had to be touched up (his room shares a wall with the bathroom). We decided to change the color of the bedroom so all the walls, trim, and the ceiling beam will get a fresh look. Today measurements went in for the shower enclosure, after months of flip flopping Travis decided against the frame-less "Euro" style and will go with a minimalist framed choice. It feels like the home stretch, although due to various events the schedule has actually slowed down a bit.
Sunday, June 21, 2015

Post-Drywall Reno Update

The last couple weeks have been an adventure. Our first issues cropped up, we discovered one minor leak that stained the ceiling downstairs, and Travis put his electrical and tinner (HVAC) skills put to the test.

The electrical bids came in SUPER high so Travis opted to do the rewiring himself. Not a difficult task, just time consuming. F and I disappeared from the house for a weekend so he could work uninterrupted.

Here's a view of wiring completion - new switches in the new wall, power for the heated tile, moving the lights, and some clean up of the entire wiring system. All that bright blue stuff is his handiwork.



Next came the plumber again, finishing up rough plumbing. He checked the tub, drain and filler to ensure everything lined up properly and set the new shower pan.

After the plumber came drywall and popcorn removal in the skylight.
A new wall! Pocket door now slides into the left side.


Mud and texture took a few days longer than normal in Colorado. It's so dry here mud usually cures faster than in other places, but with a month of rain everything has been taking longer. Our rain seems to be normalizing so we dried pretty fast, but the contractors are all behind still so we had a few days of downtime until they could get to us.



Previously we had no HVAC register in our bathroom. This seemed strange, but buying a 30+ year old house you end up with all kinds of mysteries. In the summer our bathroom gets a little warm, no big deal, but on chilly winter nights that tile floor was COLD! Our fix was to heat the floor. Lo and behold after cutting up some of the sub floor, there was a closed up duct! Our contractor made an attempt on Friday afternoon, and Travis opted to knock out the project after our swim meet yesterday. It took some mad tin cutting skills to get everything to fit right, but now we'll have heat/AC in our bathroom for the first time in decades (AND a heated floor!). I'm probably going to put my sleeping bag in my new bathtub and move into the new bathroom because it will be super snazzy compared to the rest of the house!

Travis' new duct.
Thursday, June 11, 2015

West Coast Camping 2015

The day school let out we hitched up the trailer and headed west. WAY west. All the way to the ocean west.

First stop, Crater Lake. Still very snowy, only part of the road was open.

Dinner stop at Crater Lake Lodge. Spectacular views and stellar food.

 Camping outside Crater Lake. Not even to the really big trees yet.

Our camp host gave us a list of nearby hikes to waterfalls, we picked a couple short ones and enjoyed the views. Even after a solid month of rain Colorado just isn't green like this. On the plus side, while it dumped back in CO we didn't get rained on in OR.


Next stop, Redwoods SP and NP. More hiking and poking around nature.


After a couple days in California we headed back to the Oregon Coast. First stop, a lighthouse tour. FFM has been inside lighthouses before but was small enough he doesn't remember. This one you could get right up next to the beautiful Fresnel lens

We drove US101 right up the coast, stopping when something looked fun, tasty, interesting, cool. This included farmer's markets, funky shops, fishy places, and various beaches.

Also a stop at the Newport Aquarium where we were just in time for otter feeding time. They eat restaurant quality seafood. This crab must have looked tasty, FFM requested crab for dinner.

During our stay low tide hit about mid afternoon. It was the perfect time to trek out into the water and gently investigate anemones, limpets, mussels, crabs and starfish.


 Color on my little phone is weird,  in reality this starfish was more of a purple color.

As requested, Dungeness crab for dinner! They ate the whole thing with a side of ling cod.

After a couple more beach days we headed to Tillamook, home of Tillamook cheese. They were making pepperjack cheese the day we toured.

Camping in Oregon is pretty easy, campgrounds are often right on the beach with running hot water in the bathrooms - showers! Our campground was separated from this beach by a single dune. The night of this sunset the wet sand of the beach reflected the sunset making the beach look bright red (again, not being the owner of a fancy camera my little phone did the best it could).

Most kids in OR are still in school so we had the beaches pretty much to ourselves. When we found other families, the kids, of course, immediately formed packs and hauled FFM around to show him the local flora and fauna. They also built giant castles and dug holes deeper than they are tall.

It must be a good vacation if your kid is more sand and dirt than kid...

Saturday, May 23, 2015

Mini Jim Brickman

F truly loves piano. He picked one really easy and one really challenging piece for his spring recital this year. The challenging one, an arrangement of the Jim Brickman song Rocket to the Moon, marks the first time he hasn't had his recital piece 100% memorized,  but it's also the longest/most complicated piece he's played. 

When he chose this song we came to an agreement - he could perform it only if he put in extra practice so he would be prepared come recital day. Boy, did he ever practice. Most days it was about an hour and he only complained once  (he bargained for practice a different time of day, not to give it up altogether). It paid off! 

I want to give a very special shout out to my aunt Pam who decided F would be a good recipient for my grandma's piano. I hope you know how wonderful that made F feel and I believe that having a piano that is his very own is part of what makes music so special to him. 
Monday, May 18, 2015

Demo Complete

Stage 1 is done, with demolition completed and the first part of new framing underway. We also ran into our first hiccup...

Everything out, wiring exposed, noticed some holes in the sub-floor. No biggie, provides wiring access and easily patched.

Plumbing all capped off and ready for next step, moving it all over the room.

 Existing pocket door exposed and ready to be taken out.

Master view of torn out wall and existing pocket door.

Making extra sure we like the way our new layout is going to look by using F's art paper and drawing out tub and vanity to scale. Tried out the look of the new tub filler, too bad it'll get mostly covered up by the tub, it's pretty!

New framing for the new pocket door location. Our first hiccup, they added a 2x4 to the header and it made the door opening small enough that now Travis has to duck. They'll be back in during the next framing stage to correct.

Master bedroom view of new pocket door location.