Stage 1 is done, with demolition completed and the first part of new framing underway. We also ran into our first hiccup...
Everything out, wiring exposed, noticed some holes in the sub-floor. No biggie, provides wiring access and easily patched.
Plumbing all capped off and ready for next step, moving it all over the room.
Existing pocket door exposed and ready to be taken out.
Master view of torn out wall and existing pocket door.
Making extra sure we like the way our new layout is going to look by using F's art paper and drawing out tub and vanity to scale. Tried out the look of the new tub filler, too bad it'll get mostly covered up by the tub, it's pretty!
New framing for the new pocket door location. Our first hiccup, they added a 2x4 to the header and it made the door opening small enough that now Travis has to duck. They'll be back in during the next framing stage to correct.
Master bedroom view of new pocket door location.